Scenario Matrix Template

About

A Scenario Matrix Template for Acceptance Testing is a structured tool used to validate whether the entire system meets business requirements and is ready for delivery to the customer or deployment to production. Acceptance testing is typically the final phase of the software testing lifecycle and is often performed by end users, stakeholders, or QA teams simulating real user conditions.

This matrix ensures:

  • All business-critical scenarios are verified against agreed requirements

  • The system aligns with user expectations in real-world conditions

  • Defects or gaps are identified before final sign-off

  • Compliance, usability, and operational readiness are validated

Acceptance testing scenarios often focus on business flows, real-world data, user roles, operational readiness, and sign-off criteria.

Template

Scenario ID

Scenario Description

Preconditions

Test Data / Inputs

Steps to Execute

Expected Result

Priority

Remarks

AT-01

Validate primary business process

Fully deployed system

Valid real-world data

Perform complete business workflow

Process completes successfully and matches business requirements

High

Must-pass scenario for sign-off

AT-02

Verify alternative user paths

Fully deployed system

Alternate workflow inputs

Execute alternative navigation or process path

Workflow works correctly without errors

High

Covers real-world usage variations

AT-03

Confirm legal and compliance requirements

System with compliance rules configured

Test data with compliance constraints

Execute regulated workflow

All compliance checks pass

High

Critical for regulated industries

AT-04

Validate data accuracy

System with production-like DB

Valid input dataset

Execute workflow and verify output data

Output matches expected values

High

Ensures accuracy before release

AT-05

End-user usability evaluation

Fully deployed system

Test users

Perform daily operational tasks

Users find system intuitive and usable

Medium

Non-functional validation

AT-06

Test operational readiness

Production-like environment

Standard operating procedures

Run workflows per SOP

System supports expected operational activities

Medium

Ensures readiness for go-live

AT-07

Role-based scenario validation

Users with varied permissions

User login credentials

Attempt actions per role

Permissions enforced as per business rules

High

Prevents unauthorized access

AT-08

Performance under expected load

Test environment with expected user load

Simulated concurrent requests

Run workflows under load

Performance meets SLA

Medium

Final performance validation

AT-09

Recovery and failover validation

Failover and backup systems active

Simulated component failure

Execute workflow during failure

System recovers or fails over without data loss

Low

Confirms operational resilience

AT-10

Final acceptance sign-off scenario

Complete product build

Acceptance checklist

Execute full list of business scenarios

All acceptance criteria met for release

High

Required for customer approval

Last updated